Ga direct naar de productinformatie
Rollerblade Lightning Men's Urban Inline Skate, Black and Lime
$62.70
Prijs met korting
$62.70
Normale prijs
- A SKATE FOR ALL TYPES OF SKATERS - Urban, fitness, commuting and recreational skaters wanting a very versatile product. This skate has upgraded fit features and performance, support and style with the sublimated liner.
- MEMORY BUCKLE CLOSURE SYSTEM - with additional lacing are easy to use. The buckles are micro adjustable and have additional connection points inside the skate to get a custom, precise fit.
- MOLDED SHELL SUPPORT WITH VENTILATION - support for all types of skating, enhances power transfer and a locked in feel. This, in combination with the ventilation, keeps your feet cooler on those hot days.
- PADDED LINER with SHOCK ABSORBER & FOOTBOARD SIZER - Provides superior comfort with anatomical design, fit and sublimated liner. The Footboard sizer allows you to creates a snug fit or remove it to make more room in the skate. The heel shock absorber provides great vibration dampening while skating.
- ROLLERBLADE URBAN 80mm/85A WHEELS and SG7 bearings optimize grip, maneuverability and speed while adding stability with its 243mm extruded aluminum frame and racing axles.
| Size | 10 |
| Color | Black/White |
| Brand | Rollerblade |
| Wheel Material | Polyurethane |
| Wheel Type | Inline Skate Wheel |
| Sole Material | Polyurethane |
| Closure Type | Buckle |
| Wheel Size | 8 centimeters |
| Material | Plastic |
| Pattern | Solid |
Misschien vind je dit ook leuk